Don't have the tanks done yet so can't install the inboard torque tube. Went ahead and installed the pushrods though. It's going to be a lot easier to do this now vs after the bottom skins are on. I've checked as best as I can and I don't there will be any interference. If I have to pull them out later, oh well.
Measured the rough lengths of the main pushrods and the bellcrank to aileron pushrods. Used the outboard RV-14 templates to rig the ailerons to the correct position and then installed the short pushrods and set to final length using the W-730 template. Tightened the jam nuts and torque sealed. Installed final hardware and torqued. Don't think any of it will need to come out again.
Temporarily installed the main pushrods and loosely tightened the hardware. Final install will have to wait for tanks and torque tubes.